


Aperçu du jeu
This is physics based endless racing game against traffic.
Dodge traffic vehicles at high speeds, earn score, buy&upgrade your rides from unlimited coins on every launch.
Features -
- Real feeling of driving and racing on highway roads
- Features endless car games
- Stunning 3D graphics of highway through beaches, bridges and backwaters.
- Online leaderboard to boast your score
- Exciting car racing game for all ages, for girls and boys, men and women!
- Most efficient and realistic physics and handling
- One way, two way and night mode.
- 60 fps cargame on almost all of the devices
- Dynamic map generation for different scenery look every gameplay
- No WiFi needed, can be played offline
- 9+ beautiful cars and bus to choose
- Customization through paint and wheels
- Powered by Latest Realistic Car Controller
- Unlockable Cars
- Upgradable Cars
How to play -
- Tilt, Touch buttons or steering wheel to steer
- Press gas button to accelerate and brake button to slow down
- Use Nitro to boost your speed
Get more coins -
- Driving longer distance to score more
- Near Miss - The closer you pass the more score you get
- High Speed - The more you drive at high speed the more score you get
- Wrong Lane -The more you drive in opposite direction the more score you get in two way game
- Traffic car racing games at its best
- Traffic Racing you will love
Note: Vectors used from www.freepik.com
Features -
- Real feeling of driving and racing on highway roads
- Features endless car games
- Stunning 3D graphics of highway through beaches, bridges and backwaters.
- Online leaderboard to boast your score
- Exciting car racing game for all ages, for girls and boys, men and women!
- Most efficient and realistic physics and handling
- One way, two way and night mode.
- 60 fps cargame on almost all of the devices
- Dynamic map generation for different scenery look every gameplay
- No WiFi needed, can be played offline
- 9+ beautiful cars and bus to choose
- Customization through paint and wheels
- Powered by Latest Realistic Car Controller
- Unlockable Cars
- Upgradable Cars
How to play -
- Tilt, Touch buttons or steering wheel to steer
- Press gas button to accelerate and brake button to slow down
- Use Nitro to boost your speed
Get more coins -
- Driving longer distance to score more
- Near Miss - The closer you pass the more score you get
- High Speed - The more you drive at high speed the more score you get
- Wrong Lane -The more you drive in opposite direction the more score you get in two way game
- Traffic car racing games at its best
- Traffic Racing you will love
Note: Vectors used from www.freepik.com
Développeur
Plus de jeux par Fasto Gamers